Project > Beijing Subway Line 4 Entrance

Description

Location Beijing
Floor Area 12,000m2
Design Time 2007
Completion Time 2009

Beijing Subway Line 4 Entrance

The Line 4 makes each entrance a module with care taken windows, framing peculiar scenes of its background. The unique crystal feature serves as a symbolic character. The strategy of framing is defined more clearly by the different transparences of window glass. To satisfy the demands of fast and modular manufacture, standard and pre-fabricated steel structure is adopted.