Project > Datong Airport New Terminal

Description

Location Datong, Shanxi Province
Floor Area 10,854m2
Design Time 2010
Completion Time 2013
Cooperated with China Airport Construction Group

Datong Airport New Terminal

Although it is a middle-sized terminal, the building obtains a sense of openness by concentrating most of the functional areas under the upper waiting halls. Inspired by the gabled roof of traditional Datong buildings, the terminal is dominated by an asymmetrical slopping truss and gains a large column-free interior space. The departing hall, waiting hall and baggage claim hall are arranged close to the spacious concourse lit by skylights beyond the ridge.